HomeMy WebLinkAboutCouncil Presentation 02/01/2022 Request for Budget Transfer WaterMarana Water Reclamation FY 2022 Emergency Repairs February 1, 2022 Rillito Village Trail SSO & Pipe Repair September 2021 •Location –Rillito Village Trail •Estimated Amount Discharged–19,000 Gallons •Root-Cause –Failure of Ductile Iron Pipe lining •Cost -$148,860.42 Sandario Cured in Place Pipe (CIPP) Repair September 2021 •Location –Sandario & Barnett •Estimated amount –842 LF •Root Cause –Failure of Ductile Iron Lining due to Hydrogen Sulfide Gas •Cost –$72,708.69 Subsidence Repairs July 2021 •Location –Downtown Sewer Alignment •Amount –585cy removed and re-compacted •Root Cause –Poor soil and Heavy Rains •Cost -$89,956.76 Additional Unplanned Repairs Project Name Estimated Cost Clarifier Baffle Replacement $43,472.00 Saguaro Bloom Pump Repairs $19,500.00 Yoem Pueblo Manhole Adjustment $8,933.42 Tractor Repairs $7,505.88 Dewatering System Control Panel $3,578.00 Dewatering System Gear Drive $3,492.26 Lift Station Air Release Valve $3,487.82 Polymer System Control Panel $2,832.62 Liner Repair $14,000.00 Total $106,802.00 Total Requested Expenditure Authorization Object Total Emergency Repairs Total (Acct#:6560)$418,330.87 Increase in Operating Supplies (Acct#: 7125)$6,700.00 Total Adjustment Requested $425,000.00 Budgeted Projects Still Need to be Completed •Water Reclamation Facility (WRF) UV Lamp Replacement •WRF UV Weir Replacement •WRF Sand Filter Compressor Replacement •WRF Equipment Maintenance for the Remainder of the FY •WRF Operating Supplies for the Remainder of the FY