Loading...
HomeMy WebLinkAboutResolution 2003-093 accepting portions of dove mountain boulevard phase IV into the town maintenance system F. AL'N RODRIGUEZ, RECORDER DOCKET: 12120 RECORDED BY: PSG ~ PAGE: 6575 DEPUTy RECORDER ~ NO, OF PAG'~S: 2 9394 P'~l ~E~U'~NC'~ = 20031631585 ~ 08/22/2003 TOWN OF ~a~RANA RES 16:31 ATTN: TO~N CLERK 13251 N LON ADAMS RD PICKUP MANANA AZ 85653 AMOUNT PAID $ 8.00 MARANA RESOLUTION NO. 2003-93 A RESOLUTION OF THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, ACCEPTING PORTIONS OF DOVE MOUNTAIN BOULEVARD PHASE IV INTO THE TOWN OF MARANA STREETS MAINTENANCE SYSTEM. WHEREAS, Dove Mountain Boulevard Phase IV is contained within thc Dove Mountain Specific Plan and is located entirely within the boundaries of the Town of Marana; and WHEREAS, the extension of Dove Mountain Boulevard, Secret Springs Drive and Saguaro Forest Loop are not presently included in the Town of Marana Streets Maintenance System; and WHEREAS, the roadway portion of tiffs road, excluding the landscaping, irrigation and lighting, has been inspected and recommended for acceptance into the Town of Marana Streets Maintenance System by the Town Engineer. NOW', THEREFORE, BE IT RESOLVED by the Mayor and Council of the Town of Marana that the roadway portions, excluding the landscaping, irrigation and lighting, of Dove Mountain Boulevard Phase IV including Secret Springs Drive and Saguaro Forest Loop shall be accepted into the Town of Marana Streets Maintenance System and be maintained as a public roadway. PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 19th day of August, 2003. ATTEST: Mayor BOBBY SUTTON, JR. APPROVED AS TO FORM: 0 Z Z 0 ;0 0 '1 '~] 0 O0 0 0 1 1 2 0 S