HomeMy WebLinkAboutResolution 2003-068 accepting roadway portions of coachline boulevard phase II-B into the maintenance systemMARANA RESOLUTION NO. 2003-68
A RESOLUTION OF THE MAYOR AND COUNCIL OF THE TOWN OF MARANA,
ARIZONA, ACCEPTING THE ROADWAY PORTIONS OF COACHLINE BOULEVARD
PHASE II-B INTO THE TOWN OF MARANA STREETS MAINTENANCE SYSTEM.
WHEREAS, the Coachline Boulevard Phase II was accepted by the Town of Marana on
June 4, 2002, under Resolution No. 2002-070; and
WHEREAS, Coachline Boulevard Phase ILB contains the realignment o fa portion o f
Silverbell Road and provides the all weather access point to the subdivisions north of Drainageway
No. 2; and
WHEREAS, Coachline Boulevard Phase II-B is the remainder of Coachline Boulevard as
contained within the Continental Ranch Specific Plan and is located entirely within the boundaries of
the Town of Marana; and
WHEREAS, Coachline Boulevard Phase II-B is not presently included in the Town of
Marana Streets Maintenance System; and
WHEREAS, the roadway portion of this road, excluding the landscaping and irrigation, has
been inspected and recommended for acceptance into the Town of Marana Streets Maintenance
System by the Town Engineer.
NOW, THEREFORE, BE IT RES OLVED by the Mayor and Council of the Town of Marana
that the roadway portions, excluding the landscaping and irrigation, of Coachline Boulevard Phase
I/-B shall be accepted into the Town of Marana Streets Maintenance System and be maintained as a
public roadway.
PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this
5th day of August, 2003.
ATTEST:
Mayor BOBBY SUTTON, JR.
APPROVEI
J'~celyn C. l~onson, Town Clerk
Marana, Arizona Resolution No. 2003-68