Loading...
HomeMy WebLinkAboutCouncil Presentation 06/21/2022 - Floodplain Variance: 7430 N Silverbell RdFloodplain Variance: 7430 N Silverbell Road Fausto Burruel, Acting Town Engineer 6/21/2022 Floodplain Variance Request A Variance is requested from the Town floodplain code for 7430 N Silverbell Road in relation to the timing of construction and FEMA approvals. •A CLOMR was submitted in June of 2020 and subsequently approved •LOMR improvements have been constructed •LOMR review is substantially complete Town Code 17-15-10-E10 When a modification or removal of a FEMA SFHA is sought for a development, the following requirements apply: •e. Commercial/Industrial buildings to be affected by a LOMR shall not be granted a building permit until the LOMR has become effective, unless the building as designed meets the requirements of this chapter for the pre-LOMR conditions. 2 Current Floodplain 3 SFHA –Zone A No base flood elevations (BFE)determined Commercial buildings must be elevated or dry flood-proofed four feet above highest adjacent natural grade LOMR Improvements 4 Perimeter conveyance channels tied to existing box culverts LOMR improvements have been constructed and received unofficial approval –via email Applicant desires to receive building permits to begin vertical construction prior to LOMR effective date Official FEMA LOMR approval anticipated to come in June Conditions of Variance 5 •If granted, variance is for all buildings within the Silverbell Gateway Apartments development located at 7430 N. Silverbell Road •All other aspects of Marana Land Development Code Title 17 shall be adhered to •Applicant shall sign a covenant indemnifying and holding the Town of Marana and its agents harmless in the event of flooding 6 Questions?