HomeMy WebLinkAboutCouncil Presentation 06/21/2022 - Floodplain Variance: 7430 N Silverbell RdFloodplain Variance: 7430 N Silverbell Road
Fausto Burruel, Acting Town Engineer
6/21/2022
Floodplain Variance Request
A Variance is requested from the Town floodplain code for 7430 N Silverbell Road
in relation to the timing of construction and FEMA approvals.
•A CLOMR was submitted in June of 2020 and subsequently approved
•LOMR improvements have been constructed
•LOMR review is substantially complete
Town Code 17-15-10-E10
When a modification or removal of a FEMA SFHA is sought for a development, the following requirements apply:
•e. Commercial/Industrial buildings to be affected by a LOMR shall not be granted a building permit until the LOMR has become effective, unless the building as designed meets the requirements of this chapter for the pre-LOMR conditions.
2
Current Floodplain
3
SFHA –Zone A
No base flood
elevations
(BFE)determined
Commercial
buildings must be
elevated or dry
flood-proofed four
feet above
highest adjacent
natural grade
LOMR Improvements
4
Perimeter conveyance channels
tied to existing box culverts
LOMR improvements have been
constructed and received
unofficial approval –via email
Applicant desires to receive
building permits to begin vertical
construction prior to LOMR
effective date
Official FEMA LOMR approval
anticipated to come in June
Conditions of Variance
5
•If granted, variance is for all buildings within the Silverbell Gateway Apartments
development located at 7430 N. Silverbell Road
•All other aspects of Marana Land Development Code Title 17 shall be adhered to
•Applicant shall sign a covenant indemnifying and holding the Town of Marana
and its agents harmless in the event of flooding