Loading...
HomeMy WebLinkAboutCouncil Presentation 08/03/2022 - Proposed Land Use Assumptions and Streets IIPProposed Land Use Assumptions and Streets Infrastructure Improvement Plan Fausto Burruel, PE –Town Engineer Alejandro Angel, PE -Psomas August 3, 2022 Background on Impact Fees •Authorized under ARS §9-463.05 •Can only be used (and credits given) for new improvements, not maintenance •Can NOT be used to improve existing deficiencies –only build equivalent level of service •Must be for a proportionate share2 Impact Fee Calculations 1.Determine existing level of service and users of the infrastructure 2.Calculate Equivalent Dwelling Unit (EDU) relationships between land uses 3.Forecast growth in the next 10 years –Land Use Assumptions (LUA) Document 4.Determine infrastructure needed to serve the future growth –Infrastructure Improvement Plan (IIP) 5.Divide infrastructure needed by EDUs 6.Assign credits for concurrent revenues (if applicable) 3 Land Use Assumptions -2022 4 •Updated early 2022 •Accounts for recent significant increases in growth and permits •Developments in construction assumed to be completed before new fees are implemented •Revised 10-year population and employment forecast •Residential and commercial growth estimated at subdivision level •Updated information provided to PAG for modeling •Growth allocated to fee service areas Land Use Assumptions -2022 5 •2017 Final Report •6,973 new residential units •17,103 new population •341 acres of commercial/industrial/office •4,750 new jobs •2022 Draft Report •13,942 new residential units (+99.9%) •33,414 new population (+95.4%) •439 acres of commercial/industrial/office (+28.7%) •5,165 new jobs (+8.7%) 10-year population and employment forecast 6 STREETS INFRASTRUCTURE IMPROVEMENT PLAN 7 Streets Fee Service Areas Boundaries set by: 1.Geographic features (I-10, CAP, Santa Cruz River) 2.Travel patterns Transportation Estimated Equivalent Dwelling Units (EDUs) 8 Northwest Northeast South Total Northwest Northeast South Total Residential Single Family Residential DU 7,063 2,685 1,934 11,682 1.0 7,063 2,685 1,934 11,682 Multi-Family DU 1,100 750 410 2,260 0.6 660 450 246 1,356 Hotel/Motel Rooms 0 0 0 0 0.5 0 0 0 0 Congregate Care DU 0 0 0 0 0.2 0 0 0 0 Single Family Residential (age restricted)DU 0 0 0 0 0.4 0 0 0 0 Multi-Family (age restricted)DU 0 0 0 0 0.3 0 0 0 0 < 15,000 sf 1000 sf 590 0 396 986 0.9 531 0 356 887 > 15,000 sf 1000 sf 416 29 11 456 1.4 583 41 15 639 High Traffic Retail 1000 sf 273 0 170 442 1.9 518 0 323 841 Industrial 1000 sf 1,005 414 78 1,497 0.4 402 166 31 599 Office 1000 sf 35 74 39 148 0.8 28 59 31 118 Medical Facility 1000 sf 0 0 341 341 1.1 0 0 375 375 Institutional 1000 sf 0 0 0 0 0.3 0 0 0 0 Recreation 1000 sf 0 0 0 0 0.3 0 0 0 0 9,785 3,400 3,312 16,497 Retail and Services New Service Units (2023-2032)Streets Service Unit Multiplier UnitLand Use Category New Service Units (EDUs) Total New EDUs, 2023-2032: Transportation Project Types 9 •New projects –additions to road network (i.e. Tangerine Farms north of Clark Farms) •Improvements –widening of existing roads or intersections (i.e. Twin Peaks Road at Rattlesnake Pass) •Legacy Projects –Projects already constructed with excess capacity to be provided to new development (ARS 9-463.05 (B)(7)(b)) •Legacy Credit –Built by a developer, need to reimburse costs (i.e. Clark Farms) •Legacy Capacity –Built by the Town, charge outstanding debt (Cortaro, Twin Peaks TI) Transportation Project Costs 10 •Costs of projects vary depending on drainage, environmental issues, right-of-way •Sources of cost data •Constructed (legacy) projects Actual costs •Projects in study or design Project Specific Estimate •Projects in Planning Cost per mile from recent bids in Tucson area Projected Transportation Projects -Northwest 11 Road Project Project Type Total Improvement Costs Cost of Vehicular Improv (80%) Cost of bike/ped improv (20%) Cost Attributable to Develoment Service Area Total Marana Main Street Sandario Rd Grier Rd New 3,255,000$ 3,255,000$ Marana Main Street Tangerine Farms Rd Sandario Rd Legacy 873,000$ Tangerine Farms Road I-10 (Tangerine TI)Clark Farms Legacy Clark Farms Riccati Dr Despain Dr Legacy Tangerine Farms Road Clark Farms I-10 (Marana TI)New 15,977,000$ 7,484,400$ Marana Road Interchange, Phase 1 N/A N/A Interchange Reconstruct 6,753,000$ 6,753,000$ Clark Farms Despain Dr Lon Adams Rd New 4,520,000$ 3,616,000$ 904,000$ 3,365,622$ Clark Farms Lon Adams Rd Tangerine Farms Rd New 25,313,000$ 11,774,700$ Adonis Road Grier Rd Tangerine Rd New 20,601,000$ 16,480,800$ 4,120,200$ 14,465,963$ Tangerine Road Interchange N/A N/A Interchange Reconstruct 4,500,000$ 4,500,000$ 55,490,082$ Limits Northwest3,018,397$ Projected Transportation Projects -Northeast 12 Road Project Project Type Total Improvement Costs Cost of Vehicular Improv (80%) Cost of bike/ped improv (20%) Cost Attributable to Develoment Service Area Total Tangerine Road, Phase 1 Dove Mountain Blvd Town Limits Completed Capacity 6,189,000$ 4,951,200$ 1,237,800$ 1,896,029$ Tangerine Road, Phase 2 I-10 (Tangerine TI) Dove Mountain Blvd Improvement 42,537,000$ 34,029,600$ 8,507,400$ 13,936,211$ Twin Peaks Road Lambert Ln Tangerine Rd Completed Capacity 3,642,259$ Moore Road Camino De Oeste Thornydale Rd Completed Capacity 291,788$ Cayton Road Dove Mountain Blvd Thornydale Rd New 6,630,000$ 6,630,000$ Tangerine Road Interchange N/A N/A Interchange Reconstruct 1,500,000$ 1,500,000$ 27,896,288$ Limits Northeast Projected Transportation Projects -South 13 Road Project Project Type Total Improvement Costs Cost of Vehicular Improv (80%) Cost of bike/ped improv (20%) Cost Attributable to Develoment Service Area Total Twin Peaks Interchange N/A N/A Legacy Twin Peaks Road I-10 Lambert Ln Legacy Twin Peaks Road/Rattlesnake Pass Saguaro Highlands Dr Silverbell Rd Expansion 18,001,838$ 14,401,470$ 3,600,368$ 7,506,111$ Cortaro Road I-10 Camino de Oeste Completed Capacity 8,134,735$ 6,507,788$ 1,626,947$ 2,319,081$ Silverbell Road Ina Rd Cortaro Rd Completed Capacity 21,068,682$ 16,854,946$ 4,213,736$ 8,023,017$ Ina Road I-10 Silverbell Rd Completed Capacity 9,000,000$ 7,200,000$ 1,800,000$ 3,006,062$ Silverbell Road Ina Rd Sunset Rd Expansion 8,013,159$ 6,410,527$ 1,602,632$ 2,625,316$ 27,237,473$ Limits South3,757,886$ Summary of Infrastructure Costs 14 Service Area Projects Population Growth Development’s Proportionate Share ($M) Northwest 10 15,190 $55.5 Northeast 6 11,718 $27.9 South 7 6,506 $27.2 TOTAL 23 33,414 $110.6 Questions/Discussion 15