Loading...
HomeMy WebLinkAboutCouncil Presentation 11/15/2022 - Santa Cruz River Management PlanSanta Cruz River Management Plan Proposed Projects in the Town of Marana Evan Canfield –Pima County Regional Flood Control District Kevin Payne –Kimley Horn. Santa Cruz River Mgt Plan –Grant Rd to Pinal Co •Project Purpose The purpose of the Santa Cruz River Management Plan is to develop a management strategy to balance flood risk management, drainage infrastructure protection, water recharge, recreation opportunities, public safety and riparian habitat preservation for the Santa Cruz River from Grant Rd to Pinal County. 2 http://www.pima.gov/santacruzriverplan/ Three ‘a Living River’ Reporting Reaches (2013 to present) are the basis for Three Management Plan Reaches Three Rivers/Corazon (Agua Nueva to Tres Rios) Cortaro Narrows (Tres Rios to Avra Valley Rd) Marana Flats (Avra Valley Rd to Trico Rd) How We Got Here Santa Cruz River Management Plan Phase 1 Results Alternatives Identification and Selection Concept Plans Implementation Plan Stakeholder Input CONCEPT ADVANCEMENT Stakeholder Preferences By Reach USACE Multi-Criteria Decision Analysis (MCDA) protocol 5 32.6 21.6 36.7 14.1 16.5 11.7 22.8 24.2 12.6 9.6 12.1 8.6 11.7 7.7 17.3 9.1 18 13.2 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Grant to Ina Ina to Avra Avra to Pinal Flood Control Water Resources Environment Recreation Community Compatibility Public Safety 19.9 20.9 25.1 10.4 6.2 8.2 13.5 11 8.3 8 12.7 8.9 14.4 17 8.3 7.7 7.6 4 10.3 9.1 8.8 5.7 5.3 4 4.9 4.8 13.5 5.2 5.5 8.8 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Grant to Ina Ina to Avra Avra to Pinal Floodplain Management Transportation Water Security Emergency Response Natural and Cultural Public Use Sustainability Unauthorized Uses Economic Vitality Feasibility/Implementation Project Type Alternatives Weighting Criteria Alternatives Selection Report 6 7 Santa Cruz River Mgt Plan –Project 4 8 Santa Cruz River Mgt Plan –Project 5 9 Santa Cruz River Mgt Plan –Project 6 10 Wildlife Ramp on East Bank near El Rio PreserveProject 7 11 Effluent Training Features along the LSCR Levee Project 8 Santa Cruz River Management Plan: Alternative 8 12 New Wetland near CAP Crossing –Project 9 13 Accessibility Improvements to River –Project 10 14 Wall for Freeboard and Trailhead Enhancements -11 15 Sanders Road Bridge Replacement over Santa Cruz River -Project 12 Santa Cruz River Management Plan: Alternative 12 16 Trico-Marana Rd Bridge Replacement -Project 15 Santa Cruz River Management Plan: Alternative 15 17 Trico Rd Bridge Replacement -Project 16 Santa Cruz River Management Plan: Alternative 16 18 LSCR Levee Extension, Sanders Rd to Trico Rd Project 13 Santa Cruz River Management Plan: Alternative 13 19 Multi-Use Multi-Objective Channel 20 All Non-Structural Project -Vegetation Management Plan Non-Structural Project -Update FEMA Floodplain Maps Downstream of Sanders Rd (Approved by FEMA, awaiting map Publication) How We Got Here Santa Cruz River Management Plan Phase 1 Results Alternatives Identification and Selection Concept Plans Implementation Plan Stakeholder Input CONCEPT ADVANCEMENT Implementation Plan 23 Santa Cruz River Mgt Plan –Grant Rd to Pinal County •How did we get here? •15% design-level costs •Contingency added (20% -30%) 24 Santa Cruz River Mgt Plan –Grant Rd to Pinal County •How did we get here? •Implementation Schedule was developed 25 Summary Report 26 INCLUDES: •EXECUTIVE SUMMARY •SUMMARY OF ALL DELIVERABLES & RECOMMENDATIONS •RECOGNITION OF ALL CONTRIBUTORS •Appendix A –Public Participation Report •Appendix B –Stakeholder Engagement Summary Santa Cruz River Mgt Plan –Grant Rd to Pinal County •Process Remaining •Endorsed by Jurisdiction Decision Makers •Flood Control District Advisory Committee •Pima County Board of Supervisors •Town of Marana •City of Tucson 27 http://www.pima.gov/santacruzriverplan/ Evan Canfield Pima County Regional Flood Control District evan.canfield@pima.gov Kevin Payne Kimley-Horn Kevin.Payne@kimley-horn.com Questions?