HomeMy WebLinkAboutCouncil Presentation - Town of Marana TransportationTown of Marana Transportation
Fausto Burruel, Public Works DirectorMarch 15, 2023
2
•Previous Transportation Master Plan (TMP) completed in 2001
•Previous plan covered a 25-year period from 2001 –2025
•Current TMP will have a 2045 horizon year
History of Marana TMP
3
•Evaluates existing transportation system
•Identifies future transportation system, guided by General Plan
•Helps Town know where to invest in transportation
•Assists with CIP programming
Why do a Transportation Master Plan?
4
•How has Marana grown and changed?
•How have travel patterns changed?
•How well is the transportation system serving the Town?
•How safe are the streets?
•What are current polices, practices and resources?
Marana Yesterday and Today
5
•Evaluate future needs
•Project future growth
•Identify transportation gaps
•Create Action Plan for
Short-term (5 years)
Mid-term (10 year)
Long-Term (20 years)
Marana Tomorrow
6
•Kicked off late October 2022
•Presentation to Mayor and Council January 17, 2023
•Technical Advisory Committee met January 17, 2023
•Study network identified
•Public input survey launched
•Data collection and analysis is ongoing
•Study branding established
Transportation Master Plan Update
Creating the Transportation Master Plan
7
8
•Public survey
•Facebook
•Stakeholder outreach
Public Outreach
Major Roadway CIP Update
•Tangerine Road Phase 2A
•Twin Peaks/Rattlesnake Pass
•Tangerine Farms Extension
9
10
Tangerine Road Widening, Phase IIA
11
Tangerine -Project Overview
12
Tangerine -Project Funding
Source Amount
Regional Transportation Authority $12,000,000
Town of Marana $10,000,000
Pima Association of Governments $9,000,000
State of Arizona $5,000,000
Total $37,000,000
13
Tangerine -Project Status
•Design
•Engineer -PSOMAS Inc.
•60% design now, 90% due in May 2023
•Construction
•CMAR -Borderland Construction Company
•Begin in the Summer 2023.
•Note –Project includes16” Town of Marana water line
•Location -Mandarina Blvd to Marana Tech Drive.
14
Project Challenges
•Crossing the UPRR
•3 for 1
•Road widening = New crossing
•Train Signal Work
15
Twin Peaks Rd, Rattlesnake Pass Widening
16
Twin Peaks -Project Overview
Twin Peaks -Drainage
17
18
Twin Peaks -Project Funding
•Partnership between the Town of Marana and the Developer of the Saguaro Bloom Neighborhood (DR Horton).
•Developer is responsible for:
•full cost of the design of the project
•half the cost of the road along Saguaro Bloom frontage.
•Estimated Project Cost -$30M
•Estimated Town portion of the project -$18M
19
Twin Peaks -Project Update
•Design
•Engineer –SCE Engineering
•90% now, 100% due May 2023
•Construction
•CMAR –Hunter Contracting
•Start 2024–After property acquisitions complete
20
Tangerine Farms Road Extension
21
Tangerine Farms -Project Overview
22
Tangerine Farms -Project Update
•Cost Estimate: $23,000,000.
•A Request for Qualifications (RFQ) for Design Concept Report (DCR)
•This month
•Marana TI will be evaluated as part of the DCR.
•Schedule:
•DCR and Design -2.5 years.
•Construction –1.5 years
2323
I-10 Traffic Interchanges
3/20/2023
24
Cortaro Rd I-10 Traffic Interchange
25
Cortaro Rd –Current Conditions
26
Cortaro TI -Project Overview
•The project will include:
•construction of a grade separated interchange over
Interstate-10 and UPRR
•entrance and exit ramps, access roads, culverts, pedestrian
walkways and related infrastructure
•installation of traffic signals and safety systems
•purchase of additional right of way and businesses.
•This project will be a partnership with the Town of Marana, the
Arizona Department of Transportation, and possibly the RTA.
27
Cortaro TI -Project Need
•Cortaro and Cortaro Farms Road see substantial delays during
the morning and afternoon rush hours.
•The at-grade crossing with UPRR further impacts the traveling
public.
•The need for a reconstructed Cortaro TI was identified in the
ADOT Final DCR I-10 Corridor Study, Tangerine Road to Ina
Road.
28
Cortaro TI -Project Funding
•Priority:
•Town’s highest priority among interchanges to be
reconstructed
•Cortaro TI is the Towns’s highest priority request for RTA Next
•Construction cost:
•$162.5M (Final Design Concept Report, I-10 Corridor Study
ADOT)
•Places the TI at or above $200M in today’s dollars
29
Cortaro TI -Project Details
•Schedule:
•Design will take approximately 2 years
•Construction will take about 2 ½ years
•Scope
•Alignment shifts approximately 100 feet to the east of existing I-10
•pass over I-10 and the UPRR
•widened to six travel lanes with auxiliary lanes
•The interchange would be similar in design to Twin Peaks and Ina
TI’s
30
Tangerine Rd I-10 Traffic Interchange
31
Tangerine Rd TI –Project Overview
•Tangerine Road Traffic Interchange (TI) will have two phases.
•Initial
•Striping Changes on Tangerine under I-10
•Interim
32
Tangerine Rd TI –Project Overview
•Initial Improvements
33
Tangerine TI -Project Overview
•Initial Improvements
34
Tangerine TI -Project Overview
•Initial Improvements
35
Tangerine TI -Project Overview
•Interim Improvements
36
Tangerine TI -Project Overview
•Interim Improvements
37
Tangerine TI -Project Overview
•Interim Improvements
38
Abutment Lane Construction
39
Abutment Lane Construction
40
Project Details
•Will be constructed with Tangerine Phase 2A
•Funding will be a combination of Impact Fees, Construction
Sales Tax, and from Development.
•Estimated total cost is $6.5M for both phases
41
Marana and I-10 Traffic Interchange
42
Marana TI –Project Overview
43
Marana TI –Project Overview
44
Moore Rd I-10 Traffic Interchange
45
Moore Rd TI –Big Picture
46
Moore Rd TI –How does it fit
47
Moore Rd TI –Do we need it?
Where does it go?
Who will use it?
Why not use the funds
for Marana or
Tangerine TI?
What happens if we
don’t build it?
48
Moore Rd TI –Project Information
•Dialogue has been held with ADOT and they are supportive of the
project –no funding availability.
•The Town has submitted for a Rebuilding American Infrastructure with
Sustainability and Equity (RAISE) discretionary grant for Planning.
•Design Concept Report
•Design
•Approximately $7M
•Estimated total cost is $60M