HomeMy WebLinkAboutCouncil Presentation - FY2024 Retreat Presentation - Public Works - TransportationTransportation
Fausto Burruel - Public Works Director
What is our objective?
• Provide Updates
• TMP, Current Project Status, Planned Projects
• Confirmation
• Are the planned and upcoming projects still priority?
• Guidance
• Are we going in the right direction?
TRANSPORTATION
iO'�'' MASTER PLAN
•
011i 0101290111011WITAI•
Evaluate existing conditions, mobility trends, and issues today
Fir
Assess impact of future growth on Marana's transportation system
Evaluate and prioritize potential projects
4
Marana MPA"L7
by 20550000
106%
��� population
� increase
104% increase
in total jobs
Level of Servlce
LOSA -C
LOS D
LOS E
LOS F
Study Network
River. Wash, or Canal
�--� Union Pacific Railroad
— — — County Boundary
Town of Marana
Q Town of Marana Planning Area
Park, Open Space. or Golf Course
A ,
�nuxe: b'n'n ni'+lerrna, F.na CnunPi, AJCt
x
L...:
Pinal Airpatk Rd
en lGdr�'
w
A Hardin Rd _
Marana Rd Grier Rd
Barnett Rd I r
Mocre Rd
El Tito Rd Spy
x
Mar
Reginna
na:
r,
Tatoti;a
Moumm�
Pork
ooze eira
Tonn6:a
-escr'N
Moore Rd
:
Tangerine Rd
g
c
s
Naranla Or
Lambert Ln
�
o .2e
s
Linda Vista Blvd
_
L
N
Overton Rd
=
Cortaro Farms Ra
III, M�hl Ina Rd
Sagwro f�`
Natium
Picture Rocks Rd Pak �beriR Orange Grove Rd
a
Sunset Rd Rrep�'Po'
...for horizon years
Near -Term (2024 to 2030)
Mid -Term (2031-2045)
Long -Term (2046 - 2055)
Key Questions The TMP Answers
What Traffic Interchange
Improvements are Needed
and When?
Should any of the Previously
Planned Projects be
Modified?
Should 1-10 Frontage Roads
be Extended and/or
Converted to One -Way
Couplets?
What Additional Roadway
and Intersection Projects are
Needed?
Are Previously Planned and
Programed Improvements Still
Warranted?
How Are We Integrating
Multimodal Needs?
• Develop
projects
previous
a universe of
based on needs,
plans, and ideas
• Widening
• New Roads
• Traffic Interchange and
Intersection Improvements
• Using the PAG model -
evaluate how projects
address congestion and
circulation
V
TMP Validates the Need for Numerous Projects, Including:
• Tangerine Road Widening: Dove Mountain Blvd to 1-10
• Tangerine Farms Rd Extension
• Ina Rd: Widen to 6-lanes from 1-10 to Thornydale Rd
• Twin Peaks Rd Widening
• Clark Farms Blvd (Sanders to Tangerine Rd)
1 1 t
1 1
y�
1
16
1
11AHUIN RU; i
UN * Fropo" TI
■ ■ Future toads Existing TI 1
N
0 0.5 1 2
Miles
MARANA RI)
I o
W'
,- �Z
ti
a
u, �a
■ ■ • ADONIS RD
• _ ♦ \
<,ull _ • GR11ERRO
tANNI ,',•T'ND I"%-.[ I
• r
9�
J f 1\
0
Z
RINE RD__ y ?
■ ■ ■ ■ ■ ■ ■ • ■ r ■
f.1
�F
"IKE ETIER
o a� BL -
TANGE
North Marana
Transportation
Projects
• Tangerine Road 2A
• Tangerine Road
Interchange Upgrade
• Tangerine Road 2B
• Tangerine Farms Extension
• Marana Road Interchange
• Moore Road Interchange
Transportation Projects - Tangerine Road Budgets
• Tangerine 2A:
$52.OM Budgeted
• Tangerine TI:
$lO.OM Budgeted
• Tangerine 2B:
$48.OM Budgeted
Mandarina
South
I r:_ -? r— -e'w+w.+ - JffFry
:3
♦ I—H
t ♦ ♦ � Y
%%
is
Transportation Projects
• Tangerine Road 2A:
• Schedule:
r
• Design @ Sealed plans 02/2024
• TEP Relocations to begin in October 2024
• Pending Pygmy Owl survey, ACOE - Jurisdictional Waters and ASLD
• Pending JUT Agreements, and additional construction services contract for
CAP Fiber optic lowering ($90,146.46)
• Pending Delays: UPRR design and construction of the RR Crossing. In
Progress.
• Anticipated Completion Date: Fall 2025
• Budget: $52.0 M
• There will be additional work associated with UPRR design reviews and
construction that includes a third track.
Transportation Projects
• i angenne Koaa inrercnange upgraae
• Current funding outlook:
• RTA Next
• Transportation Funds
• Grant Opportunities
• $158M
r
!mot•
• .e
i
Interim Improvements '
a
h� rederaa hate
Tangerine Farms
Road Extension -
Schedule -
DCR Completion in
January 2025
Budget - $530,000
MOORf RD
Transportation Projects
• Tangerine Farms Extension:
is Schedule:
• 30% DCR (expected start Feb `24'
is Budget
• Complete
budget: $22.OM
• Incudes: environmental, real property, permitting, engineering, and
construction
• Psomas was selected as the designer to perform the DCR tasks.
--ia&_ 4
.r.
- 'W�Ow'
Final Airpark Rd
Marana Rd TI: Temporary Improvements
• TMP validates need
• Evaluated as part of the DCR
• Schedule
• Will be constructed with Tangerine Farms
Extension
• Budget
• $1 O.OM
Marana
Reconstruct
TMP validates need
By 2045: Marana Rd TI exceeds
capacity, even if Tortolita TI is in place
Transportation Projects
• Moore Road Interchange
• RAISE (Rebuilding American Infrastructure with Sustainability and Equity) Grant
Application
_ - Grade separation with 1-10 and railroad
Improve public safety
- Reduce traffic congestion
Address drainage concerns
- -Monorchi- VS Add in pedestrian facilities
Farm Field
Five
+ •--� �� Marana match 20%
M darina
HSL Property - _
too aft ���• W RAISE ask $5.55 M
-- =a-..... '' � — .4� -Non-Fed = $1.39M
v-_ r' •, =•"• _ - •" •' Gladden \ - Total Project Cost = $6.94M
laddGenFarms 1 _ Farms II
(planning, environmental
.� and design)
: M.:
Crossroads at
• w Gladden Farms
'A._.by +� � ` •\ r1 }, �A
� rAw�
.••�•.r�, Federal tate
Moore
and/or Tangerine
✓ Moore connects to Adonis Rd
✓ Provides significant relief to Tangerine Rd
TI (especially the west side of 1-10)
✓ Reduces stress on Clark Farms Blvd
✓ Provides two access points to 1-10 in an
area projected to grow significantly
✓ Minor improvements at Tangerine TI may
suffice
✓ Less expensive than reconstructing
Tangerine Rd TI 10
✓ Less interruption to traffic during
construction
✓ Enhances overall circulation
✓ Moore Rd west of I-10 may need to be
widened to 4-lanes
RECOMMENDATION:
X Tangerine TI may still be congested
X Tangerine Rd west of I-10 may still be
congested
X May be more expensive to
reconstruct
X More interruptions to traffic during
construction
X Would not enhance overall area
circulation
* Interim Tangerine Rd TI Improvements are needed to accommodate near -term growth
If NO Interim Tangerine Rd TI improvements, Moore Rd TI needed by 2030
If Interim Tangerine Rd TI improvements are made, Moore Rd TI needed after
2030
South Marano
Transportation Projects
• Twin Peaks / Rattlesnake Pass
• Cortaro Road Interchange Upgrade
ate
'{ • S r7 �t
'••yam
0
Transportation Projects
• Twin Peaks:
• Schedule: Completed Tasks: Design, *Real Property, and
Environmental Clearances.
• Sealed plans received 1 /18/24
• Utility relocations underway
• Scheduling meetings to reconcile quantities (GMP Negotiations).
• Engineer: SCE Contractor: Hunter
• Complete Budget: $42.0 M Total Amount
• Cost will be shared w/Developer
1
.L"
Transportation Projects
• Cortaro Road Interchange
• RCE (Railroad Crossing Elimination) Grant Application
• Consultant: Psomas
• Grant Proposal Preparation
• $50M Total: $40 RCE Proposal with our $1 OM match (Required to match 20% of ask)
• RTA Next - # 1 Ask
• $l OM State Funds (secured)
• Cost Estimate = $200M
Federal ' tate
7
Ole
0
.1 I1. ,
or
11
a ki I im fidi
iT
z
rQAMCI 04JlAW1.
COMMUNITY + AQUATICS
= w CENTER