Marana Water 5-year CIP
Jing Luo, PhD, PE, Water Director
Water, 5-Year CIP Program
Project
Project Name
Total
2025
2026
Continental Reserve 24-inch Tie-in
3.336,984
685,495
Marana Park Reservoir
5,371,995
.,.,._____ .,_
156,983
New Renewable Water Resource Acquisition
4.089.500
3,004,997
971,176
NW Recharge, Recovery, and Delivery System
18.004,581
13,292,709
Picture Rocks Interconnect
1.652.018
1,450,675
SCADA and Integrated Telemetry
2.103,808
340,000
Heritage Park Water Plant
57643,864
315,741
2,506.191
2,506,191
Marana Park PFAS Treatment
12.601.000
1,260,100
5,670.450
5.670.450
Marana SC Effluent Collection
1.671.138
500,000
1,171,138
Recharge Basins Phase II
6.504,766
4,900,476
1,604.290
Water Line Replacements
570.000
90,000
120,000
120.000
120,000
120,000
Well Rehabilitation Program
670,000
110,000
140,000
140,000
140,000
140.000
B-Zone Booster and Transmission Line
4.413,278
381.002
4.032,276
B-Zone Reservoir
617,700
65,250
552,450
C-Zone Booster
1.819.375
192,188
1.627.187
Hartman Booster Stn Electrical Upgrade
220,000
220,000
Heritage Park PFAS Treatment
13.213,000
1,321,300
5,945,850
5,945.850
Pioneer Well Electrical Upgrade
220.000
220,000
Pioneer Well PFAS Treatment
3.813,000
381,300
1,715,850
1,715.850
Airport NW PFAS Treatment
26.471 .000
2,647,100
11,91 1.950
• 20 Water CIP Projects.
5-Year Water Total
2
$ 113,007,007
• Total
Estimated
Costs of over
$113 Million.
5-Year CIP Total :
$ 569,117,781
Y
Marana Park
Reservoir/Well
Improvement
�3 J
• Project needed to provide an additional water source and
storage capacity in the North Marana Water System for both
domestic and fire flows.
• Adding a 1.5 MG reservoir and a 1,000 GPM well - Estimated cost:
$5.6M.
• WIFA loan of $1,000,000 with $500,000 forgivable.
• Construction scheduled to be completed by July 2024.
• Planning underway to include a potential Marana Park Treatment
System for PFAS.
f�oof supporit ndl
beams deNvered
7
Lowerin nd 1-1/2'
Ali -
' PVC t pip
pipe tight : 1
O~
i Inside Look
A Roof support spin
roof panels placed
O
A
M.
hk , J
r A"ok-f
- I ( , - . -
Sib
Aarana Water
'icture Rocks System
' <
Continental Reserve/Twin
Peaks Interconnect
•The project proposes an interconnect between the
Hartman Vistas water system (located east of I-10) and the
Picture Rocks water system (located west of I-10).
• It will provide high quality PFAS treated water supply to
additional costumers west of 1-10 .
• Estimated project cost: $3.34M.
• Design is completed.
• Anticipated construction: Jan 2025 - Dec. 2025
E
r
+ Picture Rocks
Interconnect
,M
The Picture Rocks Interconnel project is
. `�S- the "sister" project of the Continental
Reserve/Twin Peaks Interconnect.
r
• It is vital to allow Marana to serve homes
off of the Picture Rocks system, increase
� static pressure, and improve the
► .-1 �b
f t Continental Reserve pressure zone s
�w� ability to provide fire flow after the Twin
Peaks interconnect is complete.
Ky
• Estimated project cost: $1.7M
Received WIFA loan of $4.45M with
"IL $3.45M forgivable for both
interconnects
Design is underway
fA
• A� '� "`''� Anticipated construction: - Jan. 2025 -
'�"'* Dec. 2025
x
Northwest Recharge,,
Recovery and
Delivery System
(NWRRDS) Program -
��� t o-cor� 000wR • 1 r
ImoW sc I N"RDS
300in
3
NWRRDS Program Includes Four Main Components:
1. Airport booster stations improvements/connection to
NWRRDS - Marana only: estimated $4.OM.
2. Transmission main and forebay reservoir- partnering
with Oro Valley, Metro Water: estimated for Marana is
$9.2M.
3. Marana booster station/connection to Blue Bonnet
reservoir - Marana only: estimated $4.2M.
4. Blending test - Marana only: estimated $120,000.
1 ►lt
/11111■�
I r
■
Avra Valley Rd
1
Marana • •�■` \ •1■IIIf
� 11�
11�■ / �� �1111
r �
II■[,■�on
Ir t•fi
Connection • mill
Marana Water Airport
System
• This project is managed by Metro Water with Oro Valley Water
and Marana Water as partners via CMAR deliverable.
NWRRDS • Marana's involvement to the project consists of: 1) 24-Inch
Partnered Pipeline installation along Avra Valley Rd to under the Interstate I-
10 & UPRR and extending to a Forebay Site near Twin Peaks, 2)
Project Forebay Site, and 3) SCADA.
• Total estimated cost is $51 M and Marana portion is $9.2 M.
Anticipated construction. May 2024 Mar. 2026.
WATER RECLAMATION 5-YEAR CAPITAL
IMPROVEMENT PROJECTS
Water Reclamation, 5-Year CIP Program
Project
Project Name Total
North Marana Sewer Interceptor 20.761.788
Marana WRF, Screw Press 2 2.070.070
Rillito Vista Lift Station Upgrade 1.347,877
Saguaro Bloom Lift Station Pump Replacement 200,000
Sewer Conveyance System Rehab 1.788,450
WRF Phase II 39.161.114
Stingray Sewer Interceptor 3.034.513
Clark Farms Sewer Interceptor 8.768,949
5-Year Water Reclamation Total S 77,132.761
5-Year CIP Total S 569.117.781
9
2025 2026 2027 2028
5.516.162
163.111
1.200.000
200.000
661.282 552.533 574.635
18,130.145 18.130,145
303.451 1.365, 531 1.365.531
8,768.949
• 8 Water Reclamation CIP Projects.
• Total Estimated Costs of-$77Million.
2029
WO
North Marana Sewer
Interceptor
• Needed to provide additional sewerage conveyance
capacity to the North Marana Sewer System as
recommended by the Council adopted Sewer IIP.
• It includes upsizing sewer conveyance system to 27"
gravity mains along Sagebrush Rd, Sanders Rd, and 24"
along Barnett Rd.
• Project delivery method via Design Building (DB) in two (2)
Phases.
• Estimated Cost: $20.8M.
0 Anticipated Construction: Apr. 2024 - Jun. 2025.
ew 27-Inch
ewer Main -
M
P
a Rd
Rd
C7
Ct
C/),
Upstream Connect,nn
-•ter .• � �
•
Marana WRF 2nd Screw
Press for Biosolids
Dewatering
• Design and Construction of a WRF 2nd
dewatering system for dewatering
waste activated sludge.
• The 2nd system is needed to maintain
operation of the dewatering process
during times of maintenance of the �►
duty screw press.
r
• Estimated project cost: $2.OM.
• Anticipated construction: Oct. 2024 -
Jun. 2025.
� iL
if needed)
Marana Water
Reclamation Facility
(WRF) Phase 2 Expansion
• WRF Phase II Expansion will add another
1.5 MGD treatment capacity (doubling
the existing treatment capacity) to keep
up with the fast growth in Marana Water's
service area.
• Recommended by Council Adopted
Sewer I I P.
• Estimated Project Cost: $39.2M.
• Design: Feb. 2024 - Feb. 2025.
• Anticipated Construction: TBD - depends
on influent flow rate.
........................................................................
Extstino PropertyTence Line
----------- .......... ................................
Future
Aeration Basin
Future
Aeration Bann
• Blower
Budding�Canopy
1
Influen
Recharge Facility
Phase 2 Expansion
• Recharge Facility Phase 2 Expansion also will
double the recharge capacity of the existing
facility.
• The Phase 2 Recharge Basins will be
constructed similar to Phase 1 Recharge
Basins and proposed to be located to the
north of the existing basins.
• Project Cost: -$6.5M (listed as a Water CIP).
• Received $3M WIFA grant and -$2.5M will be
applied to the construction of this project.
• Design: Feb. 2024 - Sept. 2024.
• Anticipated Construction: Nov. 2024 - June
2026.
-M
1 ^T .,
f•..;�
� � t- : �'• � .. ire ��L - .� • .�, � • )„�,.
• 28 Total Water and Water
Reclamation Projects.
• Total Costs of -$190 Million. Ai
Water, 5-Year CIP Program
Project
Project Name
Total
2025
2026
2027
2028
2029
Continental Reserve24-inch Tie-in
3.336,984
685,495
Marana Park Reservoir
5.371,995
156,983
New Renewable Water Resource Acquisition
4.089,500
3,004,997
971,176
NW Recharge, Recovery, and Delivery System
18,004,581
13,292,709
Picture Rocks Interconnect
1,662,018
1,450,676
SCADA and Integrated Telemetry
2,103,808
340,000
Heritage Park Water Plant
5.643,864
316,741
2,506,191
2,506.191
Marana Park PFAS Treatment
12,601,000
1,260,100
5,670,450
5,670,450
Marana SCEffluent Collection
1,671,138
500,000
1,171,138
Recharge Basins Phase II
6.504,766
4,900,476
1,604,290
120,000
120,000
120,000
1 120,000
Water Line Replacements
570,000
90,000
140,000
140.000
140,000
1 140,000
Well Rehabilitation Program
670,000
110,000
381,002
4,032,276
B-Zone Boosterand Transmission Line 4,413,278
65,250
B-Zone Reservoir
617,700
552,450
192,188
C-Zone Booster
1,819,375
1,627,187
220,000
Hartman Booster Sin Electrical Upgrade
220,000
1,321,300
5,945,850
5,945,850
Heritage Park PFAS Treatment 13.213.000
Pioneer Well Electrical Upgrade
220.000
220,000
1,715,850
1 1,715,850
Pioneer Well PFAS Treatment
3,813,000
381,300
2,647,100
1 11,911,950
Airport NW PFAS Treatment 26,471,000
5-Year Water Total : $ 113,007,007
5-Year CIP Total $ 569,117,781
Water Reclamation, 5-Year CIP Program
"I
rProject
Project Name
Total
2025 2026
North Marana Sewer Interceptor
20.761,788
5,516,162
Marana WRF, Screw Press 2
2.070,070
163,111
Rillito Vista Lift Station Upgrade
1.347,877
1,200,000
Saguaro Bloom Lift Station Pump Replacement
200,000
200,000
Sewer Conveyance System Rehab
1.788,450
661,282
55:
2027 2028 2029
WRFPhase ll 39.161,114 18,130,145 1 18,130,145
Stingray Sewer Interceptor 3,034,513 303,451 1,365,531
Clark Farms Sewer Interceptor 8,768,949
5-Year Water Reclamation Total : $ 77,132,761
5-Year CIP Total $ 569,117,781