HomeMy WebLinkAboutCouncil Presentation - CIP Update FY2026 WaterMARANA AZ
Water CIP Presentation
Heidi Lasham, PE - Water Director
April 1, 2025
WATER FOR TODAY,
WATER FOR TOMORROW
iI
CENTRAL ARIZONA
PROJECT (CAP)
RECLAIMED
WATER/EFFLUENT
REPLENISH.
GROUNDWATER
_ONG-TERM STORAGE
CREDIT (LTSC)
FY26 Water CIP HIGHLIGHTS
Water:
5-year CIP Plan
Project Name
Project
Totals
Continental Reserve 24-inch Tie-in
Hartman Booster Stn Electrical Upgrade
Heritage Park PFAS Treatment
Heritage Park Water Plant
Marana Park PFAS Treatment
Marana SC Effluent Collection
New Renewable Water Resource Acquisition
Picture Rocks Interconnect
Pioneer Well PFAS Treatment
Recharge Basins Phase II
Sanders Rd 24-inch Water Line
SCADA and Integrated Telemetry
Water Field office
Water Line Replacements
Well Rehabilitation Program
B-Zone Reservoir
Pioneer Well Electrical Upgrade
Airport NW PFAS Treatment
B-Zone Booster and Transmission Line
C-Zone Booster
3,536,984
220,000
15,432, 784
6,157,732
13,735,090
1,764,829
7,282,552
2,314,636
4,163,796
6,504,766
6,405,438
2,104,178
5,750,000
789,954
700,000
686,604
220,000
31,866,000
4,912,573
2,366,981
2026 2027 2028 2029 2030
200,000
220,000
1,400,578
14,032,206
2,360,950
3,165,300
6,237,495
6,237,495
465,000
799,829
4,051,249
500,000
2,276,397
1,887,399
1,604,290
6,049,343
350,000
350,000
350,000
350,000
350,000
2,500,000
2,500,000
120,000
120,000
120,000
120,000
120,000
140,000
140,000
140,000
140,000
140,000
67,860
618,744
220,000
2,800,000
14,533,000
14,533,000
4,912,573
219,094
2,147,887
Total : 116, 914, 897
Water•
FY26 CIP
Project Name
Project
Totals
2026
Hartman Booster Stn Electrical Upgrade
Heritage Park PFAS Treatment
Heritage Park Water Plant
Marana Park PFAS Treatment
Marana SC Effluent Collection
New Renewable Water Resource Acquisition
Picture Rocks Interconnect
Pioneer Well PFAS Treatment
Recharge Basins Phase II
SCADA and Integrated Telemetry
Water Field office
Water Line Replacements
Well Rehabilitation Program
220,000
15,432,784
6,157,732
13, 735, 090
1,764,829
7,282,552
2,314,636
4,163,796
6,504,766
2,104,178
5,750,000
789,954
700,000
220,000
1,400,578
2,360,950
6,237,495
4,051,249
500,000
2,276,397
1,604,290
350,000
2,500,000
120,000
140,000
•
.•
Heritage Park- Water and PEAS Treatment Campus
too
w s't
•gri.
•
s•
•
afF
N Heri''t g !Park Dr l
Heritage
Gladden
Splash Pad
F.r
Farms
Do ..
• 1,000 GPM well,
• 1,800,000-gallon storage reservoir,
0 • 1,500 GPM booster station,
• Treatment system for PFAS
• Space available for 1,4 Dioxane
wad'
Compass Park`,
GAC Bac.Wasn
Tank
Recycle Pumps
and Bag Filters
Future Storage
Tank
Purge Tank &
Rearculation
Pumps
h uture
HydropneumatlC
Tank
Future Well
t'..rr
I- I
I e I 1..
• ,
t ✓ •
i 1
1�
i ,1 I
� .r. ./
itr` r s
, .._„:
''•'1 _�A — • Design - 10/2025
A e' • Construction - CMAR
I
lit;_::::, e •• 12/2026
• PFAS treatment with
space available for 1,4
Dioxane
• WIFA Loan received
June 2024
Marana Park - PFAS Treatment
a
Parcel 21736003A
Owned by Marana
Undled School
District
Prope •Iv
Purge Tank &
Redradelfon
Pumps
f.
eilk
12-ft Diameter GAC
Contactor (Typ of 4)
W AOP
filuikang
Future 1241 Diameter
GAC Contactor (Typ of 2)
1 MG Sjorage
Tank
II
L
Marana Santa Cruz Effluent Collection
• FY26 - Design continued.
• Received WIFA grant for
diversion design.
Future recharge
basins
Existing recharge
basins
Effluent diversion
box
New pipeline
Nev ever nt,ike
LTSCs
1%
(81 AF/yr)
Groundwater
73%
(11,255 AF/yr)
New Renewable Water Resource Aquisition
CAP
15%
(2,336 AF/yr)
Reclaimed
Water
11%
(1,681 AF/yr)
CAP
15%
2,336 AF/yr
LTSCs
1%
81 AF/yr i.
Groundwater
35%
5,393 AF/yr
Effluent Lease
16%
-2,500 AF/yr
Reclaimed Water
33%
5,043 AF/yr
Goal: From Groundwa4- Dominant to ._,:newak... Dominant
Picture Rocks
Interconnect
• The Picture Rocks Interconnect project
is proposed to better serve residents in
the Continental Reserve development.
• Allows Marana to serve homes off the
Picture Rocks system,
• Increase static pressure
• improves the Continental Reserve
pressure zone's ability to provide fire
flow.
41/4
Moldy 1 FICOSler &atm
10 Naive(' to PR•ZOne
Ratter It to CP•Zcne
Ir.:or ;r. b4CUL t
ur:ize M.Ma, I
711,
• •.1 •
Pioneer Well - PFAS Treatment
• Limited space available
• Wellhead treatment
• Design - Build
• 7/2025 - 5/2027
Parcel 22615013A
Owned by Town o
Mary
Ealing 1! DIP
waMr
Parch 22615012A jj
OA'ne aby Town c' r ( /
TOP
��`. .r...i.�Z -.1
ilk Ir
Parcel ?281b019A 1• ►•
Owned by Casa Grande ► ighway LLC t ♦�
1241 Diameter D(
Vessel (Typo12)
,
XXt
,,:
•
, New Truc►
Unloadrq Pad
. r 1•�:te�
1.r
Parcel 226150096
Owned by Town of
Marana
.
�22615009A
Owned by Casa Grande
Mghway LLC
/•
,•♦
•
WRF Recharge Basins
Phase II
• Increasing recharge capacity :
• 2.0MGDto4.OMGD
• Design and Constructed with
WRF expansion
• Design: Carollo
• Construction: 8/2025 - 8/2027
ior
•
•
PROPOSED
RECHARGE BASIN
PHASE 2 AREA
•
.• ii•
• • , I.
•
•
y
•• •
4 •
.
•
wRF i ••.
EXIS I ING
RECHARGE
BASIN PHASE 1
SCADA and
Integrated Telemetry
• SCADA Master Plan
• SCADA Server Upgrades
• Completed once master
plan is complete
• Hartman Vistas System SCADA
Controls Upgrade
• Includes communication
upgrades between Hartman
Vistas Reservoir and Well,
Pioneer Well, Blue Bonnet,
Willow Vista and Cortaro
Ranch.
• Existing - Today
• Proposed - working with
procurement to get an Architect
onboard
FY26 Water Reclamation
CIP HIGHLIGHTS
Water Reclamation:
5-year CIP Plan
Project Name
Clark Farms Sewer Interceptor
Rillito Vista Lift Station Upgrade
Sewer Conveyance System Rehab
Stingray Sewer Interceptor
WRF Phase II
Project
Totals
10, 978, 724
1,470,591
1,830,050
3,416,451
49, 630, 772
2026
982,121
2027
4,827,723
2028
5,168,880
69,698
594,133
574,635
303,451
1,556,500
1,556,500
24,125,000
22,500,000
Total : 67,326,588
2029 2030
Water
Reclamation:
FY26 CIP
Project Name
Project
Totals
2026
Clark Farms Sewer Interceptor
Rillito Vista Lift Station Upgrade
Sewer Conveyance System Rehab
Stingray Sewer Interceptor
WRF Phase II
10,978,724
1,470,591
1,830,050
3,416,451
49, 630, 772
982,121
69,698
594,133
303,451
24,125,000
• Design FY26
• Construction FY27
fr
0
11
�t1
[11
NI
-01
•
r.•,
1w•>t•.s•.%
ZUM
_`
111111111111111 = •
IIIIIIIItl11111 �. yatMii
111111111111111 = ~ce i
111}IIIIIIIrm = -.- — f
111111111111111
ir• /PLLR -U 1 L
4 tix-013
N auc-o10
Ir
a m e.tt R o a a+��
• ;1
PLUG -
t/ 11111 11 i ,
or' • II lilili
1 1 IIUINn
••
•
•
111111111 11111111
11111111
11111111
11111111
4 ii ;oil MIMI r'
/1111 1i1 11
1 it Id....*
•
r 11111111111111111111111I'
11111111111 11111111111
1 11111111111
1111111111111
1111 1111111111I
1
Clark Farms Interceptor
Ala- r7. , •i
Et;; t": i
IIII1f uIIItt��
tl1111I.
1 ._
III//II11
� y
ji111�=
M 1111111111
1 a , II11111111111111
Erin
IIIIIIIII11111=
III —46
.
del
Oft
N
11111
1•
1111111111111� (`
. rl IIII I11111111 -►.. 1.111111
tI�Vl�t�'ore Roar e-
• :r. .`.,r►1111 •• !Ail`111: lead
— Lill ��11 _'11111U11• �-- �1l111111 Ill +1 !
:1�1� 1i� 1 �„•11:1111111 Y.i 11 I
1.!1/.,t_ 11�IIt�i1 �11r111 irl r�. i 1 •
' �� �:�1 1• • �r� 111111 111/1111 1111s..
11
Ilyar • 1 ' ►�» 11111 MIIII�It1111 \I/ /
�1s11/l Ill .,��1111111111 I� ,� • 1
111 ♦I �1/r_ •s •• IIIfI.•1� �• tjI�1 _ �i /
�s� j 1% �ii �• •�/f1� I'IJ11111 Ijtlr . N/11
•.., ire Y' • i f11 If .1 • .. Ir•1
%si
404,48
,• iN
. N••0• • •
. F.. ...
%. r...
IiH
1 'II 11 /III= 111
i1 _e%I, V
III zy,
NN
/, ((��jjjjIjj1I� ij>,Y
11111
11
Hill
.• i.
1...1
11.1•.
Stingray Interceptor
• Design FY26 - Upsize capacity into WRF
• Construction FY27
Water
Reclamation
Facility -
Phase II
• Phase II expansion to 3.0 MGD: Design/Construction to
be Completed by - FY28
• CMAR: Carollo (Designer) and contract negotiations
underway to bring the Contractor onboard.
J