HomeMy WebLinkAboutResolution 91-022 fee schedule for construction reports, plans, inspections and fees and rescinding resolution 88.01RESOLUTION NO. 91-22
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF MARANA, ARIZONA,
SETTING A SCHEDULE OF FEES FOR REVIEW OF REPORTS AND CONSTRUCTION
PLANS AND FOR CONSTRUCTION INSPECTION AND PERMIT FEES AND RE-
SCINDING RESOLUTION 88.01.
WHEREAS, Resolution 88-01, adopted March 1, 1988, estab-
lished fees for permits associated with street excavations and
right-of-way improvements, and,
WHEREAS, Ordinance No. 89.10, adopted May 2, 1989, deter-
mined that development fees shall be set by resolution of the
Town Council; and
WHEREAS, on September 17, 1991 the Town Council of the Town
'of Marana adopted Ordinance No.' 91.2I" establishing a permit
procedure for construction of public improvements in the Town of
Marana rights-of-way and for routine utility con~gctions and
maintenance in Town rights-of-way, and,
WHEREAS, the Town of Marana will incur expenses related to
review of reports and construction plans and related to issuing
of permits and inspection of construction. ~
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Town Council
of the Town of Marana, Arizona: ~ ~
SECTION 1. That the Town Council adopts and sets the follow-
ing fee schedule for the review of reports and plans and for con-
struction permits and inspection of construction for Public
Improvements in Town rights-of-way as regulated by Ordinance No.
91.21 or future modifications thereof:
REVIEW OF REPORTS
Fees for review of concept, environmental, hydrology/drain-
age, geotechnical, transportation/traffic, and other reports
which may be deemed necessary by the Town Engineer shall be
at $ 70 per hour, with a three (3) - hour minimum.
REVIEW OF CONSTRUCTION PLANS
Base Fee $ 350.00
Plus $ 85.00 per plan sheet
CONSTRUCTION PERMITS AND INSPECTION O__F CONSTRUCTION;
Base Fee $ 100.00
Plus: Greater of
$ 500 or 1% of
Construction cost*
* With this fee the applicant will have executed an "Agree-
ment for Inspection of Public Improvements" and will pay
the costs of all required materials and performance tests.
** For some projects, with the consent, of the Town Engi
neer, the applicant may pay a plus fee of 2-1/2 percent of
the construction cost and also agree to pay all testing
costs.
SECTION 2. That the Town Council adopts the fee schedule
established by Resolution 88.01, adopted March 1, 1988 for per-
mits associated with Regulations for Routine Utility Connections
and Maintenance in Town Rights-of-Way as regulated by Ordinance
91.21 or future modifications thereof which is as follows:
BASE FEE ........................ $ 25.00
PLANS CHECK FEE ............ 1.0% of cost of construction
INSPECTION FEE ............... 1.5% of cost of construction
COST OF CONSTRUCTION MEANS ONLY THE COST OF EXCAVATING THE PUBLIC
RIGHT-OF~WAY. COST OF CONSTRUCTION'DOES-NOT INCLUDE THE COST OR
VALUE OF THE STRUCTURE, MATERIALS OR OTHER IMPROVEMENTS IN-
ST~T~D.
ALL RECOGNIZED TOWN UTILITIES, PUBLIC UTILITIES, FRANCHISEES, AND
LICENSEES THAT WILL BE USING A SELF-CERTIFICATION ARE ONLY SUB-
JECT TO THE BASE FEE AND PLANS CHECK FEE. ~
ALL GOVERNMENTAL AGENCIES ARE ONLY SUBJECT TO THE BASE FEE.
ALL OTHER ENTITIES ARE SUBJECT TO ALL OF THE FEES.
SECTION 3. That the above fee structure supersedes any other
existing fees set by the Town of Marana with respect to the
provisions of Ordinance No. 91.21.
SECTION 4. That Ordinance 88.01 adopted March 1, 1988 is
hereby rescinded.
PASSED AND ADOPTED by the Town of Marana, Arizona this 17th
day of September, 1991.
ATTEST:
MAYOR